Installation Instructions
4.0 Connections
Profile
4.4. Electrical
4.4.1. Wiring – Important Notes
A LICENSED ELECTRICIAN must carry out 240-volt connection
wiring to the unit. It is the responsibility of the LICENSED
ELECTRICIAN that the unit is connected as per AS3000 (Wiring rules)
and any local regulations and statutory or legal requirements. A
compliance certificate is required for any new electrical connections.
It is the recommendation of Climate Technologies that a dedicated
circuit be fitted from the distribution board with a separate circuit
breaker. This may be an electrical authority requirement in some
states, and is precautionary in other states for future additions where
an existing circuit is used.
Do not use an extension cord to reach the GPO. This is illegal and
unsafe. An Electrician must relocate the GPO if the plug and cable
does not reach.
4.4.2. Wiring Connections
Have a licensed Electrician install a dedicated circuit from the distribution
board with a separate circuit breaker and a 10 Amp GPO (general-
purpose outlet) within 600mm of the dropper duct.